May 31, 2024 Leave a message

Requirements for safe use of crusher

info-670-450

  • Crushing machine driver must be trained and certified to enter the job. In close cooperation with crusher conveyor driver, recharger driver and stretch-band conveyor driver, unified signal connection, open and shut down orderly, do not use shaking light signal.
  • Operators and other personnel are strictly prohibited from approaching the crusher in operation.
  • The crusher shall start under no load conditions; the interval between two starts shall not be less than 90s, and the continuous start shall not exceed 5 times.
  • When the crusher is stuck with a large pebble or other debris, it is strictly forbidden to drill with hands or other tools, it must be stopped first, and then processed.
  • When someone is found in front of the crusher being dragged down by the scraper, the crusher should be stopped immediately.
  • During the operation, it is necessary to pay attention to the removal of coal of the scraper, not to pull large pieces of stone, timber, stainless steel and other impurities into the crushing machine, so that the crusher does not get stuck and is damaged.
  • If the crusher stops working, the crushing machine should be stopped in a timely manner, and before it starts, it should be started first, so as to avoid overload use.
  • Always pay attention to the noise of the crusher, if there are abnormalities, send a stop signal to the brick carrier driver in a timely manner, timely shutdown treatment, and power outage.
  • The crusher should be closed when handling large pieces of coal, mercury, rock on the reproducer.
  • The various safety protection facilities of the crusher are guaranteed, the use of spray equipment is not permitted, and the exit and entry dust curtains are damaged.